Built to leave the lab.

Prototypes are easy. Deployments are the job. Five steps, in this order, with one team across every input the product needs.

The five steps

  1. Step 1 of 5

    Define what working means

    Working gets defined first: what the product has to do, where it will run and how anyone will know. Numbers carry a unit and a condition from the start.

    We agree the pass criteria with you in writing before we build, and test where the product will be used.

    We need
    The people who will use it, and the conditions it has to survive.
  2. Step 2 of 5

    Prototype the riskiest part first

    Find the part most likely to fail, whether that is a motor, a model, a protocol or a market, and build that first. If it is going to fail, it should fail early and cheaply.

    We need
    Access to the hardest case: the line, the site or the data.
  3. Step 3 of 5

    Test it where it will live, and share the log

    The test that counts is on the floor, the road or the bench where it will run, not only in the lab.

    Pass criteria agreed before we build, then the log, including what failed.

    We need
    Time on site, and someone who knows the place.

    Clips from our own log

  4. Step 4 of 5

    Deploy and hand over the files

    It goes into service. The handover checklist lists what any supplier should give you at this point.

    Source code, firmware, design files, bills of materials and credentials, handed over at the end.

    We need
    Where the files should go, and who should own each account.

    The handover checklist

  5. Step 5 of 5

    Launch, measure and improve

    Customers arrive, the numbers come in, and we act on them. Growth is measured against the number your business counts.

    We need
    The number that matters to you, agreed at the start.
  6. Output

    Y = 1. It works, and customers are using it.

One plan across every input.

The firmware, the app, the model and the launch are designed as one system, because that is where products fail: in the gaps between suppliers.

Each project has one named lead, one plan and one schedule across every input it uses.

What you get in writing

  • Named engineers. You talk to the people doing the work, from the first call to handover.
  • Test results you can read. Pass criteria agreed before we build, then the log, including what failed.
  • Your source files, firmware, drawings and credentials. Source code, firmware, design files, bills of materials and credentials, handed over at the end.

Tell us what has to work.

One sentence is enough. An engineer will reply.

    Arrow keys move, Enter opens, Escape closes.